Namequoit Riverfront Restoration
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
At the beginning.
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Progress.
Namequoit Riverfront Restoration I
Riverfront bank almost ready for seeding and erosion control blanket.
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
100 % biodegradable erosion control blanket is installed.
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Planting begins.
Namequoit Riverfront Restoration I
Native herbaceous plants and woody shrubs go into the ground.
Namequoit Riverfront Restoration I
A custom native seed mix spread before installation of erosion control blanket has now emerged. Maritime shrubs are thriving.
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Fall on the Namequoit River.
Namequoit Riverfront Restoration I
Namequoit Riverfront Restoration I
Restored riverfront bank after it's second growing season.
PrevNext